Like I said in my last entry, this heat's a killer. We started at around 7:30 and put in about 2 and a half hours. What did we accomplish? Unfortunately not too much.
When we did our test fit last weekend, we saw that the bottom panels were about two inches too wide. So this week we (actually it was just Greg) built a jig so we could draw a line along the hull without removing the sides that we'd strapped on, and then we ran a circular saw along the length of the bottom panels and shaved off the extra. In short, we finished about 1/2 hour worth of work in about 2 and a half hours.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment